{"id":5828,"date":"1979-05-19T11:45:44","date_gmt":"1979-05-19T09:45:44","guid":{"rendered":"https:\/\/www.bachy-soletanche.com.hk\/?post_type=avada_portfolio&p=5828"},"modified":"2024-07-29T05:21:14","modified_gmt":"2024-07-29T03:21:14","slug":"mtrc-lai-king-to-kwai-fong-and-kwai-fong-to-kwai-hing-viaducts","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.com.hk\/offer-portfolio\/mtrc-lai-king-to-kwai-fong-and-kwai-fong-to-kwai-hing-viaducts\/","title":{"rendered":"MTRC Lai King to Kwai Fong and Kwai Fong to Kwai Hing Viaducts"},"content":{"rendered":"
The Project constructs overhead viaducts between MTR Lai King station and Kwai Fong station, and between Kwai Fong station and Kwai Hing station. Total length of the viaducts is approx. 1,280m. The works also include construction of elevated stations of Kwai Fong and Kwai Hing.<\/p>\n<\/div>
Scope of Works<\/span><\/p><\/h2><\/div> Construction of barrettes as foundations for the overhead viaducts between MTR Lai King station and Kwai Fong station, and between Kwai Fong station and Kwai Hing station. Owner:<\/span> Engineer:<\/span> General contractor:<\/span> Period of works:<\/span>
\n– Barrettes: (a) 43 nos., (b) 3.6m & 6.2m long, (c) 1.2m & 1.5m thick, (d) excavation area 5,014m2<\/p>\n<\/div><\/div><\/div>
\n Mass Transit Railway Corporation <\/span><\/b><\/p>\n<\/div>
\n Freeman Fox & Partners<\/span><\/b><\/p>\n<\/div>
\n Dragages et Travaux Publics <\/span><\/b><\/p>\n<\/div>
\nMay 1979 to Sep. 1979 <\/span><\/b><\/p>\n<\/div><\/div><\/div>