{"id":5509,"date":"2022-11-19T06:32:53","date_gmt":"2022-11-19T05:32:53","guid":{"rendered":"https:\/\/www.bachy-soletanche.com.hk\/?post_type=avada_portfolio&p=5509"},"modified":"2024-07-24T09:44:34","modified_gmt":"2024-07-24T07:44:34","slug":"public-housing-development-at-san-kwai-street","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.com.hk\/offer-portfolio\/public-housing-development-at-san-kwai-street\/","title":{"rendered":"Public Housing Development at San Kwai Street"},"content":{"rendered":"

<\/h2><\/div>

Project Description<\/span><\/h2>\n<\/div>
<\/div>

This is a Public Housing Development Project of which involves construction of one 42-storey residential block with a lift tower, a pedestrian footbridge and an elevated walkway at San Kwai Street.<\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Scope of Works<\/span><\/p><\/h2><\/div>

Construction of foundations and retaining structures, and carrying out dewatering and excavation and lateral support works. Foundations include large diameter bored piles, mini piles and the associated pile caps, while retaining structures include sheet pile walls.
\n– Bored piles: (a) 34 nos., (b) diameter 3m
\n– Mini piles: (a) 47 nos., (b) diameter 273mm
\n– Sheet pile walls: (a) 395m long
\n– Excavation and lateral support works: (a) bulk excavation, (b) 2 layers of strut & waling<\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Owner:<\/span>
\nHong Kong Housing Authority<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Engineer:<\/span>
\nHong Kong Housing Authority In-House Engineer\u200b<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

General contractor:<\/span>
\nBachy Soletanche Group Limited<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Period of works:<\/span>
\nNov. 2022 to Mar. 2024<\/span><\/b><\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div><\/div><\/div>