{"id":5439,"date":"2020-01-19T06:29:07","date_gmt":"2020-01-19T05:29:07","guid":{"rendered":"https:\/\/www.bachy-soletanche.com.hk\/?post_type=avada_portfolio&p=5439"},"modified":"2024-07-24T09:58:42","modified_gmt":"2024-07-24T07:58:42","slug":"tseung-kwan-o-lam-tin-tunnel-road-p2-and-associated-works","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.com.hk\/offer-portfolio\/tseung-kwan-o-lam-tin-tunnel-road-p2-and-associated-works\/","title":{"rendered":"Tseung Kwan O – Lam Tin Tunnel – Road P2 and Associated Works"},"content":{"rendered":"

<\/h2><\/div>

Project Description<\/span><\/h2>\n<\/div>
<\/div>

Road P2 of the Tseung Kwan O – Lam Tin Tunnel is a vital link in the 11.9km long Route 6 planned between west Kowloon and the Tseung Kwan O development area to the east.<\/p>\n

Road P2 links the center of Tseung Kwan O new town with the east end of the main tunnel section of the same project, which is delivering 3.4 km of dual carriageway between the planned Trunk Road T2 of Route 6 to the west and planned Cross Bay Link to the east.<\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Scope of Works<\/span><\/p><\/h2><\/div>

Construction of large diameter bored piles as foundation of the bridge abutment at Portion IX.
\n– Bored piles: (a) 10 nos., (b) diameter 2.2m<\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Owner:<\/span>
\nCivil Engineering and Development Department<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Engineer:<\/span>
\nAecom Asia Company Limited<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

General contractor:<\/span>
\nChina Road & Bridge Corporation-Build King Joint Venture<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Period of works:<\/span>
\nJan. 2020 to May 2020<\/span><\/b><\/p>\n<\/div><\/div><\/div>