{"id":5387,"date":"2020-02-19T06:09:49","date_gmt":"2020-02-19T05:09:49","guid":{"rendered":"https:\/\/www.bachy-soletanche.com.hk\/?post_type=avada_portfolio&p=5387"},"modified":"2024-07-24T09:54:41","modified_gmt":"2024-07-24T07:54:41","slug":"hkia-contract-3405-third-runway-concourse-foundation-and-substructure-works","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.com.hk\/offer-portfolio\/hkia-contract-3405-third-runway-concourse-foundation-and-substructure-works\/","title":{"rendered":"HKIA Contract 3405 – Third Runway Concourse Foundation and Substructure Works"},"content":{"rendered":"

<\/h2><\/div>

Project Description<\/span><\/h2>\n<\/div>
<\/div>

The Project constructs the new passenger concourse covering approximately 283,000m\u00b2 to offer high-tech facilities, environmentally friendly features and a range of shopping and dining options for passengers, for the Third Runway of Hong Kong International Airport.<\/span><\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Scope of Works<\/span><\/p><\/h2><\/div>

Construction of large diameter bored piles as foundations and the substructure of the new terminal related to the Third Runway.
\n– Bored piles: (a) 900 nos., (b) diameter 1.5m to 3m, (c) max. depth 106m<\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Owner:<\/span>
\nAirport Authority Hong Kong<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Engineer:<\/span>
\nAecom Asia Company Limited<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

General contractor:<\/span>
\nCRBC-Bachy-Sambo Joint Venture<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Period of works:<\/span>
\nFeb. 2020 to Present<\/span><\/b><\/p>\n<\/div><\/div><\/div>