{"id":13649,"date":"2024-01-01T09:05:14","date_gmt":"2024-01-01T08:05:14","guid":{"rendered":"https:\/\/www.bachy-soletanche.com.hk\/?post_type=avada_portfolio&p=13649"},"modified":"2024-07-17T09:39:52","modified_gmt":"2024-07-17T07:39:52","slug":"yuen-long-south-trial-pile","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.com.hk\/offer-portfolio\/yuen-long-south-trial-pile\/","title":{"rendered":"Yuen Long South Trial Pile"},"content":{"rendered":"

<\/h2><\/div>

Project Description<\/span><\/h2>\n<\/div>
<\/div>

The Project comprises of 4 numbers of trial piles in north-west part of New Territories. 2 test piles being tested for the performance of using new low carbon concrete mix with Ground Granulated Blast-Furnace Slag (GGBS) in typical deep foundation scale & 2 test piles for testing the frictional and bearing capacity of metasedimentary bedrock.\u00a0<\/p>\n<\/div>

<\/div>
<\/div>
<\/div>
<\/div>
<\/div>
<\/div>

Scope of Works<\/span><\/p><\/h2><\/div>

Construction of trial bored piles. Foundations include 2 numbers of large diameter bored piles constructed by Grab, Oscillator and RCD. Then, filled with new low carbon concrete using high dosage of GGBS. 2 piles constructed by Concentric Drilling and then load tested the metasedimentary bedrock capacity with Osterberg\u00ae Cell and kentledge system.<\/p>\n

– \u00d8813mm Bored piles: (a) 2 nos., (b) testing metasedimentary bedrock capacity with Osterberg\u00ae Cell and kentledge\u00a0<\/p>\n

– \u00d83000mm Bored piles: (a) 2 nos. (b) testing the performance of new low carbon concrete with high dosage of GGBS<\/p>\n<\/div><\/div><\/div>

<\/div><\/div><\/div>

Owner:<\/span>
\nCivil Engineering and Development Department<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Engineer:<\/span>
\nOve Arup & Partners Hong Kong Limited<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

General contractor:<\/span>
\nTung Lee Civil Engineering Limited<\/span><\/b><\/p>\n<\/div>

<\/div>
<\/div><\/div>
<\/div>

Period of works:<\/span>
\nJan. 2024 to Jul. 2024<\/span><\/b><\/p>\n<\/div><\/div><\/div>