{"id":13536,"date":"2024-02-01T09:03:56","date_gmt":"2024-02-01T08:03:56","guid":{"rendered":"https:\/\/www.bachy-soletanche.com.hk\/?post_type=avada_portfolio&p=13536"},"modified":"2024-07-17T10:16:33","modified_gmt":"2024-07-17T08:16:33","slug":"public-housing-development-at-yip-on-factory-estate-kowloon-bay","status":"publish","type":"avada_portfolio","link":"https:\/\/www.bachy-soletanche.com.hk\/offer-portfolio\/public-housing-development-at-yip-on-factory-estate-kowloon-bay\/","title":{"rendered":"Public Housing Development at Yip On Factory Estate, Kowloon Bay"},"content":{"rendered":"
The development comprises five blocks of 34-storey residential buildings which are supported by 109 number Large Diameter Bored Piles via 5 numbers of pile caps.\u00a0<\/p>\n<\/div>
Scope of Works<\/span><\/p><\/h2><\/div> Construction of foundations, ELS works and pile caps. Foundations include large diameter bored piles, while retaining structures include installation of sheet pile walls, strut and waling.<\/p>\n – Bored piles: (a) 109 nos., (b) diameter \u00d82.8m to \u00d83.0m, (c) total length ~6,700m<\/p>\n – ELS works: (a) Installation of sheet pile, strut & waling (b) total weight ~2,500 tons.<\/p>\n – Pile Caps: (a) Concrete ~ 30,000m3 (b) Reinforcement ~10,000 tons.<\/p>\n – Pile Removal: (a) abandoned H-pile removal ~ 100 nos<\/p>\n The scope of the foundation works includes the installation of 109 nos Large Diameter Bored Piles with bellout in diameter of \u00d82.8m, \u00d83.0m & \u00d83.3m, excavation lateral support (ELS) works, pile cap construction and removal of abandoned H piles.<\/p>\n<\/div><\/div><\/div> Owner:<\/span> Engineer:<\/span> General contractor:<\/span> Period of works:<\/span>
\nHong Kong Housing Authority<\/span><\/b><\/p>\n<\/div>
\nHong Kong Housing Authority<\/span><\/b><\/p>\n<\/div>
\nBachy Soletanche Group Limited<\/span><\/b><\/p>\n<\/div>
\nFeb. 2024 to Present<\/span><\/b><\/p>\n<\/div><\/div><\/div>