Project Description

The development comprises five blocks of 34-storey residential buildings which are supported by 109 number Large Diameter Bored Piles via 5 numbers of pile caps. 

Scope of Works

Construction of foundations, ELS works and pile caps. Foundations include large diameter bored piles, while retaining structures include installation of sheet pile walls, strut and waling.

– Bored piles: (a) 109 nos., (b) diameter Ø2.8m to Ø3.0m, (c) total length ~6,700m

– ELS works: (a) Installation of sheet pile, strut & waling (b) total weight ~2,500 tons.

– Pile Caps: (a) Concrete ~ 30,000m3 (b) Reinforcement ~10,000 tons.

– Pile Removal: (a) abandoned H-pile removal ~ 100 nos

The scope of the foundation works includes the installation of 109 nos Large Diameter Bored Piles with bellout in diameter of Ø2.8m, Ø3.0m & Ø3.3m, excavation lateral support (ELS) works, pile cap construction and removal of abandoned H piles.

Owner:
Hong Kong Housing Authority

Engineer:
Hong Kong Housing Authority

General contractor:
Bachy Soletanche Group Limited

Period of works:
Feb. 2024 to Present

0+
Years in Hong Kong
0M$+
Yearly Turnover
0+
Projects Completed
0+
Employees

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.