Project Description

This is a Public Housing Development Project of which involves construction of one 42-storey residential block with a lift tower, a pedestrian footbridge and an elevated walkway at San Kwai Street.

Scope of Works

Construction of foundations and retaining structures, and carrying out dewatering and excavation and lateral support works. Foundations include large diameter bored piles, mini piles and the associated pile caps, while retaining structures include sheet pile walls.
– Bored piles: (a) 34 nos., (b) diameter 3m
– Mini piles: (a) 47 nos., (b) diameter 273mm
– Sheet pile walls: (a) 395m long
– Excavation and lateral support works: (a) bulk excavation, (b) 2 layers of strut & waling

Owner:
Hong Kong Housing Authority

Engineer:
Hong Kong Housing Authority In-House Engineer​

General contractor:
Bachy Soletanche Group Limited

Period of works:
Nov. 2022 to Mar. 2024

0+
Years in Hong Kong
0M$+
Yearly Turnover
0+
Projects Completed
0+
Employees

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.