Project Description

This is a Public Housing Development Project of which involves construction of two 41-storey and one 35-storey new harmony residential towers, providing a total of 1,953 domestic units, a 6-storey L-shaped commercial complex and a network of pedestrian links to connect with the neighboring domestic blocks.

Scope of Works

Construction of foundations for two tower blocks, one commercial centre and one annex block. Foundations include large diameter bored piles, rock socketed H-piles and mini piles. The works also include shifting an existing road by extending the existing embankment and relocating / reconstructing the associated utilities.
– Bored piles: (a) 85 nos., (b) diameter 1.8m to 2.85m
– Rock socketed H-piles: (a) 207 nos., (b) diameter 610mm, (c) bored length 4,306m
– Mini piles: (a) 328 nos.

Owner:
Hong Kong Housing Authority​

Engineer:
Grey Wong & Associates

General contractor:
Bachy Soletanche Group Limited

Period of works:
Feb. 2001 to Nov. 2002

0+
Years in Hong Kong
0M$+
Yearly Turnover
0+
Projects Completed
0+
Employees

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.

You have a project ?

Bachy Soletanche is the Leading Specialist Geotechnical and Foundation Contractor, contact us without delay.