Project Description
The Tsuen Wan Depot of MTR is built to house and maintain MTR M-Train EMU trains serving on the Tsuen Wan line. This depot is capable of housing 40 trains, and cleaning of trains as well as minor and major inspections of trains are carried out in this depot.
Scope of Works
Construction of large diameter bored piles as foundations for the Tsuen Wan Depot of MTR and the associated topside development.
– Bored piles: (a) 158 nos., (b) diameter 1.6m, (c) bored length 2,761m
Owner:
Mass Transit Railway Corporation
Engineer:
Ove Arup & Partners
General contractor:
Dragages-Coignet Joint Venture
Period of works:
Dec. 1979 to Jun. 1980