Project Description
The Project constructs a combined 1.8km long eight cell tunnel structures for the automatic people mover (APM) and baggage handling system (BHS) systems, which facilitate travelers to move between the new Third Runway Concourse and the expanded Terminal 2.
Scope of Works
Construction of reinforced slurry wall panels under low headroom in the area within existing CSM and Seawall, and land cement soil mixing panels.
– Reinforced slurry wall panels: (a) 492 nos., (b) 1.2m thick, (c) excavation volume 34,585m³
– Land cement soil mixing panels: (a) 210nos., (b) dimension 2.8m x 1.0m, (c) excavation volume 8,232m³
Owner:
Airport Authority Hong Kong
Engineer:
Aecom Asia Company Limited
General contractor:
Gammon Construction Limited
Period of works:
Nov. 2020 to Mar. 2022