Project Description
The Project constructs the new passenger concourse covering approximately 283,000m² to offer high-tech facilities, environmentally friendly features and a range of shopping and dining options for passengers, for the Third Runway of Hong Kong International Airport.
Scope of Works
Construction of large diameter bored piles as foundations and the substructure of the new terminal related to the Third Runway.
– Bored piles: (a) 900 nos., (b) diameter 1.5m to 3m, (c) max. depth 106m
Owner:
Airport Authority Hong Kong
Engineer:
Aecom Asia Company Limited
General contractor:
CRBC-Bachy-Sambo Joint Venture
Period of works:
Feb. 2020 to Present